Seabrook Wastewater Superintendent Curtis Slayton discusses 2021 Warrant Article 12, a retrofit of the twenty year old Seabrook Wastewater Plant. This retrofit addresses some of the aging equipment and in so doing would reduce operational costs at the plant, and provide some direct return on investment.
- My Tweets
-
Recently Written
- Remembering David Crosby
- A look at “Chip War: The Fight for the World’s Most Critical Technology” by Chris Miller
- A Look at “The Avoidable War” by Kevin Rudd
- A Look at Pacific Crucible: War at Sea in the Pacific, 1941-1942 by Ian Toll
- A Look at “And There Was Light: Abraham Lincoln and the American Struggle” by Jon Meacham
- RIP Christine McVie
- Seabrook Announces 2022 Tax Rate
- A Look at Blood and Iron: The Rise and Fall of the German Empire 1871-1918 by Katja Hoyer
- A Look at “Thank You for Your Servitude: Donald Trump’s Washington and the Price of Submission” by Mark Leibovich
- The Ian Bremmer Interview With Tony Blair
Archive
Categories
- Books
- Brexit
- Capital Improvement Plan
- Casino Gaming
- Education Reform
- Electoral Map
- Fifth Congressional
- Greece
- Health Care Reform
- History
- International
- Ireland
- Manzi in the Morning
- Media
- Merrimack Valley Politics
- Methuen
- Methuen City Council
- Methuen Mayor's Race
- Municipal Finance
- Music
- National News
- Resiliency
- Seabrook
- Song of the Week
- Sports
- State News
- Surveys
- Technology Beat
- Transportation Finance
- U.S. Senate Race
- Uncategorized
- WCAP Podcast
There is an error for this article
The ballot for this article says will not lapse until project is completed or in 5 years (December 31,2016). This should say (December 31, 2026)
LikeLike