Seabrook Wastewater Superintendent Curtis Slayton discusses 2021 Warrant Article 12, a retrofit of the twenty year old Seabrook Wastewater Plant. This retrofit addresses some of the aging equipment and in so doing would reduce operational costs at the plant, and provide some direct return on investment.
- My Tweets
-
Recently Written
- Seabrook Water Tanks Get Key Maintenance
- A look at the Barack Obama Memoir “A Promised Land”
- Seabrook Selectmen to Return to Live Meetings
- Seabrook Fire Brings on a New Firefighter.
- A Look at “De Valera Rise 1882-1932” by David McCullagh
- Seabrook 2021 Election Results
- Curtis Slayton on Seabrook Warrant Article 12
- A Look at “The Man Who Ran Washington” by Peter Baker and Susan Glasser
- A Look at Bob Woodward’s “Rage”
- The Seabrook 2021 Warrant
Archive
Categories
- Books
- Brexit
- Capital Improvement Plan
- Casino Gaming
- Education Reform
- Electoral Map
- Fifth Congressional
- Greece
- Health Care Reform
- History
- International
- Manzi in the Morning
- Media
- Merrimack Valley Politics
- Methuen
- Methuen City Council
- Methuen Mayor's Race
- Municipal Finance
- Music
- National News
- Seabrook
- Song of the Week
- Sports
- State News
- Surveys
- Technology Beat
- Transportation Finance
- U.S. Senate Race
- Uncategorized
- WCAP Podcast
There is an error for this article
The ballot for this article says will not lapse until project is completed or in 5 years (December 31,2016). This should say (December 31, 2026)
LikeLike