The Rte. 93 Rotary Project is a critical project for this region. As many who have attended countless meetings know the Commonwealth of Massachusetts was ready to move forward with its Short Term Improvement Plan, which would be the interim project before the permanent solution is designed and built. As part of that Short Term Plan the Commonwealth was prepared to build a temporary ramp which would have been built very close to adjoining neighborhoods, in particular Noyes Street. In light of the concerns of the neighbors relative to both construction and then post construction noise issues, as well as financial issues, Mass Highway has made the decision to scrap the ramp portion of the Short Term Improvement Plan. The other items included in the Short Term Plan, including signalization, will remain. My thanks to Senator Baddour, who has worked with the City, State, and residents to achieve some consensus.
-
Recently Written
- The Methuen Inaugural Now and Then 2026 Edition
- A Look at “King of Kings” by Scott Anderson
- The Lessons of Munich
- A Look at “Stuck” by Yoni Appelbaum
- Town of Seabrook 2024 Water Sewer Financial Reports
- A Look at Apple in China by Patrick McGee
- A Look at Presidential Command by Peter Rodman
- Seabrook Announces Tax Agreement With NextEra
- Seabrook Memorial Day 2025
- Tony Blair On Leadership
Archive
Categories
- Appeasement
- Books
- Brexit
- Capital Improvement Plan
- Casino Gaming
- Education
- Education Reform
- Electoral Map
- Fifth Congressional
- Greece
- Health Care Reform
- History
- International
- Ireland
- Manzi in the Morning
- Media
- Merrimack Valley Politics
- Methuen
- Methuen City Council
- Methuen Mayor's Race
- Munich Conference
- Municipal Finance
- Music
- National News
- NextEra
- Resiliency
- Seabrook
- Song of the Week
- Sports
- State News
- Surveys
- Technology Beat
- Transportation Finance
- U.S. Senate Race
- Uncategorized
- WCAP Podcast
Hello Mr. Mayor,
I’ve definitely noticed the improved signage as well as the new lane configurations, but what other temp improvements can we expect to see at the rotary before year’s end? Lighting, etc…
LikeLike
Your Honor,
I’m confused. Most of the post discusses the temporary ramp and the subsequent removal from the preliminary plan.
Then you say signalization remains and possibly some other things.
Does that mean all that will be done is signalization? Is that enough or is more to be done. What will signalization accomplish?
This is not a dig, just an inquiry to understand.
Jules
LikeLike
Jules,
The project has been broken up into the “Short Term Improvements”, which will be done in advance of the “Permanent Solution”, which will likely not begin construction until 2014. The signalization will occur at the intersection of Rte 110 and Riverside Drive, and is designed to improve rotary safety as well as better manage traffic flow. That signalization is part of the “Short Term Improvements”. The ramp that was omitted was a part of the “short term improvements” and has caused high levels of anxiety because of its proximity to residential areas of Methuen.
Bill
LikeLike
Thank you
LikeLike