The work on the Methuen Dracut Sewer project is set to begin shortly. Dracut has awarded the sewer project to Bridges LLC, with a tentative start date within the first two weeks of September. I will post more information as it becomes available.
-
Recently Written
- Methuen’s 300th Birthday
- Michael Collins- The Father of Ireland
- Congressman Chris Pappas in Seabrook
- A Look at Rise and Kill First
- A Look at President Carter: The White House Years by Stuart Eizenstat
- The Methuen Inaugural Now and Then 2026 Edition
- A Look at “King of Kings” by Scott Anderson
- The Lessons of Munich
- A Look at “Stuck” by Yoni Appelbaum
- Town of Seabrook 2024 Water Sewer Financial Reports
Archive
Categories
- Appeasement
- Books
- Brexit
- Capital Improvement Plan
- Casino Gaming
- Education
- Education Reform
- Electoral Map
- Fifth Congressional
- Greece
- Health Care Reform
- History
- International
- Ireland
- Israel
- Manzi in the Morning
- Media
- Merrimack Valley Politics
- Methuen
- Methuen City Council
- Methuen Mayor's Race
- Mossad
- Munich Conference
- Municipal Finance
- Music
- National News
- NextEra
- Resiliency
- Seabrook
- Song of the Week
- Sports
- State News
- Surveys
- Technology Beat
- Transportation Finance
- U.S. Senate Race
- Uncategorized
- WCAP Podcast
Your Honor,
After reading the “Palin Vetting Process” entry I would say the sewer project is under way.
(comments are shut off)
Right down into the gutter with you Democrat hit men. Enjoy.
She will stand up to the scrutiny.
Maybe you guys should have vetted Obama better.
Disappointed in you guys.
Jules
LikeLike
It hasn’t even been a week, and the pubbies are already in panic mode for crying out loud….DAMN that LIBERAL press!
As that little doomsayer in Gulliver’s Travels yused to say: “It’ll never work, they’re doomed”…and I’m hopeful. 😉
LikeLike
Mayor Manzi,
Thanks for the follow up on this.
Steve Blair
LikeLike